Article content material
Residents and motorists who use the westbound Richmond Street, between New Orchard and McEwen avenues, are alerted that the strip will probably be closed for Stage 2 LRT work beginning on Sunday, Sept. 11, at 6 a.m.
Article content material
The closure will stay in place till the top of 2023.
Article content material
Westbound motorists and cyclists will probably be rerouted to Ambleside Drive, New Orchard Avenue after which again to Richmond Street.
Detour signage will probably be in place whereas the closure is in place, the Metropolis of Ottawa suggested Wednesday.
Throughout building, pedestrian entry to companies will stay open always on Richmond Street, and residents and guests are inspired to proceed to assist Richmond Street companies.
For extra info on metropolis packages and providers, go to ottawa.ca, name 3-1-1 (TTY: 613-580-2401) or 613-580-2400 to contact town utilizing Canada Video Relay Service.
It’s also possible to join with the Metropolis of Ottawa by way of Fb, Twitter and Instagram.
-
Geotechnical research revive hypothesis about Kettle Island bridge over Ottawa River
-
Richmond Street condominium residents worry noise, vibration from close by LRT