Mumbai: After 45 years of Girgaon-Kalbadevi constructing collapse, victims get voice as Thackeray Sena faction protests | Consultant pic
Mumbai: About 45 years since a constructing in Girgaon collapsed, the problem to rehabilitate the households introduced Girgaon-Kalbadevi to a halt on Tuesday when Uddhav Thackeray faction of Shiv Sena introduced out a protest march within the space.
The protest was in opposition to the Mumbai Metro 3 Aqua line snaking underground between Colaba-Bandra-SEEPZ. Different calls for from the locals have been additionally raised within the protest.
“The Mumbai Metro Rail Company Restricted has discontinued hire of about 70-80 affected models. There are points pertaining to succession rights, sharing the timeline and deadline of the metro challenge, sharing of draft paperwork corresponding to remaining settlement, allotment letter and conveyance deed, and non-payment of 10 per cent increased rental yearly, amongst others issues. Authorities authorities should not on the identical web page on the eligibility of shopkeepers and residents,” mentioned Pandurang Sakpal, who heads South Mumbai unit of Shiv Sena Uddhav Balasaheb Thackeray.
One other situation that was highlighted was pertaining to outdated and dilapidated buildings alongside the metro hall the place part of the construction has suffered injury as a result of development associated vibrations.
On Tuesday’s protest, an MMRC spokesperson clarified that, “All points raised and representations obtained from Girgaon-Kalbadevi residents have been addressed and suitably replied to. MMRC has not obtained any new representations at present from any of the project-affected individuals or the organisers of the agitation. Any new points raised can be appropriately resolved and can be conveyed to the candidates.”
On the eligibility of residents and the collapsed constructing, an official shared that MHADA had already rehabilitated them within the transit camps. The brand new residences that can be prepared on the identical plot can be handed over to MHADA, who in flip will resolve who’s eligible to get the unit, as per the process.
It might be recalled that about 7 years in the past, the residents had locked horns with the state authorities for a greater compensation bundle as their buildings have been affected as a result of metro rail’s development.
In all, 737 households in Girgaon and Kalbadevi have been displaced by the challenge, till its completion. As a particular compensation bundle, they are going to be supplied with double the scale of the sooner houses.
It isn’t solely the tenants of those 26 buildings at Girgaum-Kalbadevi who can be accommodated in an even bigger dwelling, but in addition the households residing in a few of the surrounding buildings that must be damaged all the way down to make room for metro station services like entry/ exit factors, air flow shafts, auxiliary sub-station, and many others.
(To obtain our E-paper on whatsapp day by day, please click on right here. To obtain it on Telegram, please click on right here. We allow sharing of the paper’s PDF on WhatsApp and different social media platforms.)