Vancouver Pile Driving spent the previous few weeks driving non permanent piles across the derelict barge to safe it
Article content material

The painstaking, generally noisy work of dismantling an enormous barge that washed ashore at English Bay throughout an enormous winter storm final yr has lastly begun in earnest.
Vancouver Pile Driving spent the previous few weeks driving non permanent piles across the derelict barge to safe it whereas the work of taking it aside is underway. The corporate then put in security limitations and fences.
Now comes the precise elimination. That’s anticipated to take three to 4 months, that means the barge ought to lastly be gone simply in need of a yr after the Nov. 15, 2021, storm and king tide that drove it ashore and stranded it.
Article content material
Refloating the barge proved not possible, and it languished on the seashore so lengthy it was rechristened Barge Chilling Seaside — a riff on the unofficial renaming of Vancouver’s Guelph Park to Dude Chilling Park in recognition of an summary “reclining man” sculpture.
Whereas space residents should take care of noise because the work goes on from 7:30 a.m. to five:30 p.m. Monday to Friday, these utilizing the seawall and seashore received’t be affected. All the fabric removals are being performed from the water facet of the barge and the corporate has stated the delicate marine atmosphere will stay intact.
The Metropolis of Vancouver says the dismantling should adjust to noise bylaws and will probably be monitored all through.
It should embody elimination of the barge partitions and hulls in sections, with the fabric being loaded onto assist barges and hauled away by sea to a staging space, the place will probably be processed and recycled.